NIMZ Zaheerabad Latest News: Ground-Level Progress, Investment Scale, and Regional Impact
Jan 3, 2026
The NIMZ Zaheerabad project is moving into a critical phase of execution, marking a major step in Telangana’s industrial and economic development journey. With land acquisition progressing rapidly, infrastructure works gaining momentum, and government agencies closely monitoring implementation, the National Investment and Manufacturing Zone (NIMZ) at Zaheerabad is no longer just a proposal—it is steadily becoming a reality.
This article brings you NIMZ Zaheerabad latest news, backed by verified figures, development costs, land details, employment projections, and infrastructure updates directly linked to the project’s current progress.
What Is NIMZ Zaheerabad and Why It Matters
The National Investment and Manufacturing Zone (NIMZ) concept was introduced by the Government of India in 2013 to:
Attract large-scale investments
Increase industrial productivity
Strengthen manufacturing capabilities
Create long-term employment, especially for local youth
Across India, around 13 NIMZ projects were planned, of which one was sanctioned for Telangana, strategically located near Zaheerabad in Sangareddy district.
NIMZ Zaheerabad is being developed as part of the Hyderabad–Nagpur Industrial Corridor, positioning it as a key manufacturing and logistics hub in South India.
NIMZ Zaheerabad Latest News: Land Acquisition Status
One of the most significant updates relates to land acquisition, which is the foundation of any large industrial zone.
Total Land Planned
12,635 acres proposed for the NIMZ project
Spread across 17 villages in:
Jharasangam Mandal
Nyalkal Mandal
Land Acquired so far
Approximately 9,000 acres have already been acquired
Villages involved include:
Bardipur
Yelgoi
Chillapalli
Chillapalli Thanda
Select villages in Nyalkal Mandal
The land acquisition process is progressing at a steady pace, with officials conducting continuous monitoring to ensure transparency and timely completion.
First Phase Development: 3,245 Acres Approved
In the first phase, development activities have been approved for 3,245 acres of land acquired within the NIMZ region.
This phase has received joint approval from the Central and State Governments, signaling strong policy-level commitment.
Investment Structure
Central Government share: 49%
State Government share: 51%
Total Project Cost (First Phase)
Approximately ₹2,369 crore
This phase will focus on establishing core industrial infrastructure, creating the base for future industrial units and ancillary development.
Infrastructure Development: Roads, Power, Water, and Drainage
Infrastructure creation is currently one of the most active components of the NIMZ Zaheerabad project.
Dedicated Access Road to NIMZ Zaheerabad
A major milestone achieved is the completion of a dedicated road connecting the NIMZ region.
Length: Approximately 9 kilometers
Route: From National Highway 65 (NH-65) at Huggelli to Bardipur village outskirts in Jharasangam Mandal
Cost: ₹100 crore
The road has already been completed and was inaugurated by Chief Minister Revanth Reddy, significantly improving access to the industrial zone.
This road is expected to play a crucial role in:
Industrial logistics
Workforce mobility
Regional connectivity
Smart Infrastructure Works: ₹596.61 Crore Investment
Another major update under NIMZ Zaheerabad latest news is the awarding of infrastructure tenders for smart industrial development.
Approved Infrastructure Scope
Within the 3,245 acres of first-phase land (Bardipur, Chillapalli, Chillapalli Thanda, and Yelgoi villages), infrastructure works include:
Internal roads
Power supply systems
Bridges and culverts
Canals and drainage networks
Water supply infrastructure
Planned industrial layout development
Tender Awarded To
SRR Private Limited, Hyderabad
Infrastructure Investment
₹596.61 crore
The company is expected to officially begin execution of smart-city-grade industrial infrastructure, ensuring modern standards suitable for global manufacturing operations.
Role of Government Agencies
Two key institutions are jointly overseeing industrial development works:
State Industrial Infrastructure Corporation
National Industrial Corridor Development and Implementation Trust (NICDIT)
Their involvement ensures:
Planned zoning
Infrastructure compliance
Integration with national industrial corridors
Only government-recognized and approved agencies have been invited to participate in tenders, strengthening accountability and execution quality.
Employment Generation: A Major Economic Driver
One of the core objectives of NIMZ Zaheerabad is employment creation at scale.
Projected Employment Figures
2.5 lakh direct jobs
5 lakh indirect jobs
These opportunities are expected to emerge across:
Manufacturing units
Logistics and warehousing
Support services
Transport and maintenance
Small and medium enterprises (SMEs)
This level of employment is expected to significantly benefit local youth across Sangareddy district and nearby regions.
Impact on Real Estate and Regional Development
With infrastructure works and industrial execution gaining pace, real estate activity around NIMZ Zaheerabad has already intensified.
Regions Expected to Benefit
Sangareddy
Sadashivapet
Zaheerabad
Narayankhed
Why Real Estate Is Gaining Momentum
Proximity to a large-scale industrial hub
Improved road connectivity
Long-term employment-driven demand
Government-backed infrastructure development
Land values and development interest are increasing steadily, driven not by speculation but by visible progress on the ground.
Continuous Monitoring and Administrative Oversight
District administration officials, including the Collector, are actively reviewing:
Road alignments
Infrastructure plans
Execution timelines
This continuous supervision ensures that development aligns with approved master plans and avoids unplanned expansion.
Why NIMZ Zaheerabad Is Strategically Important
Beyond regional growth, NIMZ Zaheerabad holds national importance due to:
Its role in the Hyderabad–Nagpur Industrial Corridor
Alignment with Make in India manufacturing goals
Decongestion of major urban industrial centers
Balanced regional development across Telangana
The project is designed not as a standalone industrial park, but as a self-sustaining industrial ecosystem with long-term economic relevance.
What to Expect Next
Based on current progress, the next stages are expected to include:
Faster execution of internal infrastructure works
Allocation of industrial plots to manufacturing units
Increased industrial investments
Expansion of residential and commercial developments around the zone
As full-scale operations begin, the economic influence of NIMZ Zaheerabad will extend well beyond district boundaries.
Conclusion: NIMZ Zaheerabad at a Turning Point
The latest news on NIMZ Zaheerabad clearly shows that the project has entered a decisive implementation phase. With:
12,635 acres planned
9,000 acres already acquired
₹2,369 crore first-phase investment
₹100 crore dedicated road
₹596.61 crore smart infrastructure works
7.5 lakh total employment potential
NIMZ Zaheerabad is positioned to become one of Telangana’s most important industrial growth engines.
As infrastructure, industry, and real estate develop in parallel, Zaheerabad is transitioning from a regional town into a nationally significant industrial destination—driven by planning, policy support, and sustained execution.
Related Articles
Invest in Open Plots near NIMZ Zaheerabad – Mumbai Highway
NIMZ Zaheerabad: What It Means for Real Estate and Plot Buyers
Hyderabad Real Estate Market 2025: What Changed and What to Expect in 2026
Telangana Mobility Valley at Mominpet – Why This Area Is Becoming the Next Growth Story

